Work Package 2 (2017)
The newly built Hüttengraben site in Küsnacht is planned and constructed as a 2000-Watt Site by the cooperative BG Zurlinden. If these ambitious energy consumption targets can actually be met can only be observed after the realization of the project. This is because respective consumption behavior of the households is required. Against this background, the project aims at combining technical solutions with behavior change interventions to reduce energy consumption in the Hüttengraben site. Together with the cooperative, a set of interventions with high saving potentials that are locally accepted are developed and implemented. Impacts are assessed both through technical monitoring of energy demand as well as social science research methods.
Im Demonstrationsprojekt werden technische Lösungen mit Verhaltensinterventionen verknüpft, um nachhaltig den Energieverbrauch in Haushalten zu senken. Gemeinsam mit der Genossenschaft Zurlinden werden passende, sozial akzeptierte und potentiell hoch wirksame Interventionen entwickelt und in einer Neubausiedlung systematisch getestet. Durch ein Monitoring des Energieverbrauchs wird die Wirksamkeit der Interventionen quantifiziert. Zusätzlich wird deren Akzeptanz mittels Fragebogen analysiert. Aus diesen Ergebnissen wird eine Umsetzungshilfe mit empfohlenen Interventionen abgeleitet. Das Ziel der Umsetzungshilfe ist es, anderen Genossenschaften und Immobilienverwaltungen Hinweise zu geben, wie sie durch Interventionen den Energieverbrauch in ihren Siedlungen reduzieren können.
Nadège Vetterli, Dr. Corinne Moser, Uros Tomic
Zurich University of Applied Sciences (ZHAW)